IN DEPTH
Interesting 2012 article 'South Morden Dairy' by Sydney A. Leleux about rail operations at South Morden including photographs, mainly from 1974. (Reproduced from the Industrial Railway Record, Edition 210, September)
See Also
Rail Operations throughout Express Dairy
1954 South Morden Processing 'Express Halt' rail siding. (Stills from Express Dairy Film)
1954 South Morden Processing 'Express Halt' rail siding. (Stills from Express Dairy Film)
1954 South Morden Processing rail siding. Space for 2 x 7 tanks (14) under cover, and four additional outside. (Stills from Express Dairy Film)
1954 South Morden Processing rail siding. Space for 2 x 7 tanks (14) under cover, and four additional outside. (Stills from Express Dairy Film)
1954 South Morden Processing rail siding. Space for 2 x 7 tanks (14) under cover, and four additional outside. Tanks could be discharged and cleaned from any position. (Stills from Express Dairy Film)
1954 South Morden Processing rail siding. Space for 2 x 7 tanks (14) under cover, and four additional outside. Tanks could be discharged and cleaned from any position. (Stills from Express Dairy Film)
1954 South Morden Processing rail siding. Three additional tanks being shunted outside, with the dairy's own shunting engine. Coal wagons on the left for the boilers, coal-fired at that time. Roger Frost comments "The coal wagons were unloaded with a big hand-held scoop that was pulled along by a winch cable that was controlled by the operator. Hard to describe but very efficient in its operation." (Stills from Express Dairy Film)
1954 South Morden Processing rail siding. Three additional tanks being shunted outside, with the dairy's own shunting engine. Coal wagons on the left for the boilers, coal-fired at that time. Roger Frost comments "The coal wagons were unloaded with a big hand-held scoop that was pulled along by a winch cable that was controlled by the operator. Hard to describe but very efficient in its operation." (Stills from Express Dairy Film)
1954 South Morden OS Map 1-1250 showing track layout in rail siding. (Courtesy National Library of Scotland)
1954 South Morden OS Map 1-1250 showing track layout in rail siding. (Courtesy National Library of Scotland)
1954 South Morden Processing shunting engine. Raffaele Ralph Phillips comments "Poor old 'David'; I worked on both shunters whilst employed as a vehicle electrician in the maintenance garage 1970-88." (Stills from Express Dairy Film)
1954 South Morden Processing shunting engine. Raffaele Ralph Phillips comments "Poor old 'David'; I worked on both shunters whilst employed as a vehicle electrician in the maintenance garage 1970-88." (Stills from Express Dairy Film)
1954 South Morden Processing. Agitating and sampling from a rail tank.  (Stills from Express Dairy Film)
1954 South Morden Processing. Agitating and sampling from a rail tank. (Stills from Express Dairy Film)
1955 South Morden. Jimmy Reid posted this picture, and comments "This is how we got our name from the trains that delivered bulk milk to depots and plants across the country." Colin J Marsden also commented "When I was a young secondman at Waterloo, a regular turn was to go on the Morden Milk, taking a few GW 6-wheel tanks round in the morning and going to fetch them early afternoon after off-loading. Quite often the morning inbound train was worked through by Western men. Over the years I took a number of pictures at the milk terminal and one day one of the older staff came over with a black and white picture taken at the depot in 1955. He said 'you can have this, this is what it was like here in the 50s'. I carefully preserved it and today I've scanned it. I do not know the details of the loco, but he said it was taken the day it was delivered to the facility. (Courtesy Colin J Marsden and Jimmy Reid) Poor quality version also published in Express News July 1956
1955 South Morden. Jimmy Reid posted this picture, and comments "This is how we got our name from the trains that delivered bulk milk to depots and plants across the country." Colin J Marsden also commented "When I was a young secondman at Waterloo, a regular turn was to go on the Morden Milk, taking a few GW 6-wheel tanks round in the morning and going to fetch them early afternoon after off-loading. Quite often the morning inbound train was worked through by Western men. Over the years I took a number of pictures at the milk terminal and one day one of the older staff came over with a black and white picture taken at the depot in 1955. He said 'you can have this, this is what it was like here in the 50s'. I carefully preserved it and today I've scanned it. I do not know the details of the loco, but he said it was taken the day it was delivered to the facility. (Courtesy Colin J Marsden and Jimmy Reid) Poor quality version also published in Express News July 1956
1955 South Morden opening - Heathcoat Amory and Walter Nell
1955 South Morden opening - Heathcoat Amory and Walter Nell
1955 South Morden brochure (Courtesy Dave Fane)
1955 South Morden brochure (Courtesy Dave Fane)
1956 South Morden station and rail reception. Matthew Pinto comments "Interestingly there appears to be a 50's LMS Stannier full brake coach in one of the dairy sidings. An interesting find so deep into Southern Railway territory." (Courtesy Bill Rudd, Mitcham Historical Society)
1956 South Morden station and rail reception. Matthew Pinto comments "Interestingly there appears to be a 50's LMS Stannier full brake coach in one of the dairy sidings. An interesting find so deep into Southern Railway territory." (Courtesy Bill Rudd, Mitcham Historical Society)
1959 Milk delivery schedule by rail
1959 Milk delivery schedule by rail
1950's? South Morden (From Express Milk for London-John Hosegood)
1950's? South Morden (From Express Milk for London-John Hosegood)
1960's Morden South (Courtesy Geoff Smith, Flickr)
1960's Morden South (Courtesy Geoff Smith, Flickr)
1960's Wimbledon (Courtesy Geoff Smith, Flickr)
1960's Wimbledon (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden (Courtesy Geoff Smith, Flickr)
1960's South Morden, lifting tank for use as storage (Courtesy Geoff Smith, Flickr)
1960's South Morden, lifting tank for use as storage (Courtesy Geoff Smith, Flickr)
1960's Shunter overlooking car park (Courtesy Geoff Smith, Flickr)
1960's Shunter overlooking car park (Courtesy Geoff Smith, Flickr)
1960's South Morden, Express Rail Tank (Courtesy Richard Gaylard)
1960's South Morden, Express Rail Tank (Courtesy Richard Gaylard)
1960's Shunter looking up rail siding, storage tank now in position (Courtesy Geoff Smith, Flickr)
1960's Shunter looking up rail siding, storage tank now in position (Courtesy Geoff Smith, Flickr)
1962 Ruston & Hornsby 0-4-0 diesel locomotive at the Express Dairy bottling plant, Morden South. Mike Morant comments "The picture was taken from the window of a passing EMU whilst travelling towards Sutton from Wimbledon in September 1962." Peter Roper comments "Driving it, and its successor, was fun-I did it several times. You had to anticipate the (lack of) braking, especially when shunting full wagons. The two unloading bays took 14 tanks, 7 each side. But on some nights we might receive up to 18. On one famous occasion, a member of staff let it run off the catch points, partly blocking the Wimbledon line 😮. I had to phone the signaller, urgently!!" (Slide taken by Mike Morant, courtesy Paul Smith)
1962 Ruston & Hornsby 0-4-0 diesel locomotive at the Express Dairy bottling plant, Morden South. Mike Morant comments "The picture was taken from the window of a passing EMU whilst travelling towards Sutton from Wimbledon in September 1962." Peter Roper comments "Driving it, and its successor, was fun-I did it several times. You had to anticipate the (lack of) braking, especially when shunting full wagons. The two unloading bays took 14 tanks, 7 each side. But on some nights we might receive up to 18. On one famous occasion, a member of staff let it run off the catch points, partly blocking the Wimbledon line 😮. I had to phone the signaller, urgently!!" (Slide taken by Mike Morant, courtesy Paul Smith)
1963 Morden South (Courtesy Geoff Smith, Flickr)
1963 Morden South (Courtesy Geoff Smith, Flickr)
1964/5 St Helier (Courtesy Geoff Smith, Flickr)
1964/5 St Helier (Courtesy Geoff Smith, Flickr)
1965 South Morden rail siding, with BR 75078 locomotive. 75078 was built at Swindon in 1956 and as it was built for use on the Southern Region it was fitted with a BR1B tender which had a capacity of 4,725 gallons, because there were no water troughs on the Southern Region. It was equipped with a double chimney in October 1961. (Courtesy Bill Rudd, Mitcham Historical Society)
1965 South Morden rail siding, with BR 75078 locomotive. 75078 was built at Swindon in 1956 and as it was built for use on the Southern Region it was fitted with a BR1B tender which had a capacity of 4,725 gallons, because there were no water troughs on the Southern Region. It was equipped with a double chimney in October 1961. (Courtesy Bill Rudd, Mitcham Historical Society)
1965 Morden South (Courtesy Geoff Smith, Flickr)
1965 Morden South (Courtesy Geoff Smith, Flickr)
1965 Morden South (Courtesy Geoff Smith, Flickr)
1965 Morden South (Courtesy Geoff Smith, Flickr)
1965 St Helier (Courtesy Geoff Smith, Flickr)
1965 St Helier (Courtesy Geoff Smith, Flickr)
1966 South Morden. Off the rails-the engine was hauling a load of empties, but jumped the points and effectively sealed off the branch siding to South Morden bottling dairy, and prevented a daily 30,000 gallons from getting through. "Fortunately British Rail are used to such mishaps, no one was hurt and the line was cleared for traffc within 48 hours, allowing the milk tanks through again." (Express News Summer)
1966 South Morden. Off the rails-the engine was hauling a load of empties, but jumped the points and effectively sealed off the branch siding to South Morden bottling dairy, and prevented a daily 30,000 gallons from getting through. "Fortunately British Rail are used to such mishaps, no one was hurt and the line was cleared for traffc within 48 hours, allowing the milk tanks through again." (Express News Summer)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 Morden South derailment (Courtesy Geoff Smith, Flickr)
1966 Morden South derailment (Courtesy Geoff Smith, Flickr)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 South Morden. BR Standard Class 4 Tank 80141 jumped the points with a load of empty tanks, closing the line and siding for 48 hours. (Photographer Sam Jones)
1966 80141 re-railed. Southern Railway Email Group explains "BR Standard Class 4 Tank. 155 of this class of locomotives were built in Brighton, Derby and Doncaster works between 1951 and 1957 and became general workhorses on all the regions of British Railways, except the Western. Not things of beauty with their somewhat unattractive "rear ends", they were a product of the development by British Railways of a series of twelve "Standard" locomotive designs embracing the best practices of the pre-nationalisation railways. Designed by RA Riddles, British Railways' Chief Mechanical Engineer, these tanks were one of the most successful of the "Standards", doing well all that was asked of them." (Photographer Sam Jones)
1966 80141 re-railed. Southern Railway Email Group explains "BR Standard Class 4 Tank. 155 of this class of locomotives were built in Brighton, Derby and Doncaster works between 1951 and 1957 and became general workhorses on all the regions of British Railways, except the Western. Not things of beauty with their somewhat unattractive "rear ends", they were a product of the development by British Railways of a series of twelve "Standard" locomotive designs embracing the best practices of the pre-nationalisation railways. Designed by RA Riddles, British Railways' Chief Mechanical Engineer, these tanks were one of the most successful of the "Standards", doing well all that was asked of them." (Photographer Sam Jones)
1966 Morden South derailment (Courtesy Geoff Smith, Flickr)
1966 Morden South derailment (Courtesy Geoff Smith, Flickr)
1967 "Ruston & Hornsby 48DS shunter 235511 is seen outside the discharging shed. Presumably the full brake had been shunted here to avoid taking space in the shed, and subsequently was placed at the rear of a departing train. There was no similar full brake on my later visit, but by then the guard would have ridden in the rear cab of the locomotive on a fully-fitted train such as these milk tanks." Matthew Pinto comments "This shunter was resident at Morden from its opening in 1954 to 1972. Full brakes disappeared from milk trains in 1969 when the regulations changed to allow the second man to travel in the rear cab. They reappeared from time to time when a single cab diesel like a Class 09 shunter was used." Robert Turner adds "This was a diesel mechanical shunter made by Ruston Hornsby of Lincoln, and had a nominal 48 horsepower. In practice that meant just enough power to move 2 or 3 loaded milk tankers." (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1967 "Ruston & Hornsby 48DS shunter 235511 is seen outside the discharging shed. Presumably the full brake had been shunted here to avoid taking space in the shed, and subsequently was placed at the rear of a departing train. There was no similar full brake on my later visit, but by then the guard would have ridden in the rear cab of the locomotive on a fully-fitted train such as these milk tanks." Matthew Pinto comments "This shunter was resident at Morden from its opening in 1954 to 1972. Full brakes disappeared from milk trains in 1969 when the regulations changed to allow the second man to travel in the rear cab. They reappeared from time to time when a single cab diesel like a Class 09 shunter was used." Robert Turner adds "This was a diesel mechanical shunter made by Ruston Hornsby of Lincoln, and had a nominal 48 horsepower. In practice that meant just enough power to move 2 or 3 loaded milk tankers." (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1970's? South Morden rail reception - possibly annotated for model-making? (Courtesy Dave Fane)
1970's? South Morden rail reception - possibly annotated for model-making? (Courtesy Dave Fane)
1970's Hunslet diesel shunter at South Morden rail siding, by refuelling tank
1970's Hunslet diesel shunter at South Morden rail siding, by refuelling tank
1970's The dairy from Morden South station platform
1970's The dairy from Morden South station platform
1970's The dairy from Morden South station platform
1970's The dairy from Morden South station platform
1970's South Morden dairy rail siding
1970's South Morden dairy rail siding
1970's IMS tank at South Morden dairy rail siding. Matthew Pinto comments "GWR Diagram 056 in post-nationalisation IMS livery".
1970's IMS tank at South Morden dairy rail siding. Matthew Pinto comments "GWR Diagram 056 in post-nationalisation IMS livery".
1970's South Morden dairy rail siding
1970's South Morden dairy rail siding
1970's South Morden dairy rail siding
1970's South Morden dairy rail siding
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's Closeups of milk tankers being unloaded at South Morden. (Photographer Sam Jones)
1970's South Morden Rail Siding (Courtesy Paul Simm)
1970's South Morden Rail Siding (Courtesy Paul Simm)
John Failes comments "I took this photo from a passing train during the 70’s, of a much photographed loco standing in the exchange sidings." Christopher Townsley identifies it as a Hunslet Yardmaster, DAVID (HE5308/60).From the Industrial Locomotive Enthusiasts Page FB Group.
John Failes comments "I took this photo from a passing train during the 70’s, of a much photographed loco standing in the exchange sidings." Christopher Townsley identifies it as a Hunslet Yardmaster, DAVID (HE5308/60).From the Industrial Locomotive Enthusiasts Page FB Group.
1970's South Morden. Matthew Pinto comments "A Hunslet Yardmaster, which replaced the older Ruston Hornsby 48DS shunter in 1972." (Courtesy Richard Gaylard)
1970's South Morden. Matthew Pinto comments "A Hunslet Yardmaster, which replaced the older Ruston Hornsby 48DS shunter in 1972." (Courtesy Richard Gaylard)
1970's South Morden Rail Siding, with Hunslet shunter.
1970's South Morden Rail Siding, with Hunslet shunter.
1970's South Morden dairy rail siding-'David' by oil storage tank - tanker at end of same siding
1970's South Morden dairy rail siding-'David' by oil storage tank - tanker at end of same siding
1970's Ruston 48DS 235511 in the rail siding, with milk tanks under cover-probably 14 that day as they are stabled right up to the end of the rail reception bay. (Courtesy Geoff Smith)
1970's Ruston 48DS 235511 in the rail siding, with milk tanks under cover-probably 14 that day as they are stabled right up to the end of the rail reception bay. (Courtesy Geoff Smith)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1970's South Morden rail unloading bay in operation. (Photographer Sam Jones)
1979 Preparation of old rail siding for car and lorry parking. (Picture from Sam Jones via Geoff Smith)
1979 Preparation of old rail siding for car and lorry parking. (Picture from Sam Jones via Geoff Smith)
1970's South Morden rail unloading bay with water tank being repurposed. Raffaele Ralph Phillips comments "I started my apprenticeship in 1970 in the building far right, as a Motor Vehicle electrician. The tank being positioned was used to condense steam that when cooled became distilled water used for topping up lead acid batteries. It supplied our garage and the EVM depots who maintained the milk floats and forklifts." (Photographer Sam Jones)
1970's South Morden rail unloading bay with water tank being repurposed. Raffaele Ralph Phillips comments "I started my apprenticeship in 1970 in the building far right, as a Motor Vehicle electrician. The tank being positioned was used to condense steam that when cooled became distilled water used for topping up lead acid batteries. It supplied our garage and the EVM depots who maintained the milk floats and forklifts." (Photographer Sam Jones)
South Morden Dairy-removal of tank 3117 for used for storage. (Photographer Sam Jones)
South Morden Dairy-removal of tank 3117 for used for storage. (Photographer Sam Jones)
South Morden Dairy-removal of tank 3117 for used for storage. (Photographer Sam Jones)
South Morden Dairy-removal of tank 3117 for used for storage. (Photographer Sam Jones)
South Morden Dairy-removal of tank 3117 for used for storage. (Photographer Sam Jones)
South Morden Dairy-removal of tank 3117 for used for storage. (Photographer Sam Jones)
1970's undercover rail siding (Courtesy Geoff Smith, Flickr)
1970's undercover rail siding (Courtesy Geoff Smith, Flickr)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1970's South Morden rail siding and adjacent main line in its final days prior to closure in 1979. (Photographer Sam Jones)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt?  Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt? Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt?  Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt? Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt? Stephen Godden adds "Esmond Lewis-Evans, who ran the South Eastern Steam Centre Ashford, in the foreground helping with the loading after he'd acquired this loco, that's his rusty Vauxhall Victor in front of the trailer." Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt? Stephen Godden adds "Esmond Lewis-Evans, who ran the South Eastern Steam Centre Ashford, in the foreground helping with the loading after he'd acquired this loco, that's his rusty Vauxhall Victor in front of the trailer." Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt?  Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt? Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt?  Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1972 Ruston 48DS 235511 being lifted out by crane into the car park on 26th July to be taken by road to the Ashford Steam Centre. Possibly Brian Wallis, plant engineer, directing the crane in white shirt? Raffaele Ralph Phillips comments "This shunter was in use when I joined the company in 1970-as an apprentice vehicle electrician I had to check the batteries and some basic electric circuits whilst in service, also checking the charging system on the shunter which involved starting her up! (Picture by Sam Jones, courtesy Geoff Smith)
1971 South Morden dairy from the station. (Courtesy Robert Carroll)
1971 South Morden dairy from the station. (Courtesy Robert Carroll)
1972 New South Morden Shunting Engine p5
1972 New South Morden Shunting Engine p5
1973 New shunter (Courtesy Geoff Smith, Flickr)
1973 New shunter (Courtesy Geoff Smith, Flickr)
1974 "A general view of Express Dairies' sidings" (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1974 "A general view of Express Dairies' sidings" (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1974 "The entrance to Express Dairies' siding at Morden South with the 2-lever ground frame and associated equipment" (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1974 "The entrance to Express Dairies' siding at Morden South with the 2-lever ground frame and associated equipment" (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1974 "Milk tank wagons W44510 and W3027, both in a grubby silver and black livery, with the "StIvel" wagon W44047" (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1974 "Milk tank wagons W44510 and W3027, both in a grubby silver and black livery, with the "StIvel" wagon W44047" (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1974 "Hunslet 5308 stands outside the discharging shed; note the aluminium painted rails inside" (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1974 "Hunslet 5308 stands outside the discharging shed; note the aluminium painted rails inside" (from 'South Morden Dairy' article by Sydney A. Leleux in the Industrial Railway Record, Edition 210, September 2012)
1977 Express Dairy milk tanker W44198 at South Morden with Hunslet 'Yardmaster' DAVID
1977 Express Dairy milk tanker W44198 at South Morden with Hunslet 'Yardmaster' DAVID
1977 Milk was still being received by rail, up to 14 3000 gallon tanks could be accomodated under cover, and more outside in the sidings.
1977 Milk was still being received by rail, up to 14 3000 gallon tanks could be accomodated under cover, and more outside in the sidings.
1979 South Morden rail siding just prior to removal, Express Dairy Tales collection
1979 South Morden rail siding just prior to removal, Express Dairy Tales collection
1970's South Morden-Substantial concrete buffers at the end of the rail siding, with CIP tank above, just prior to removal.
1970's South Morden-Substantial concrete buffers at the end of the rail siding, with CIP tank above, just prior to removal.
1979 Track lifting (Courtesy Geoff Smith, Flickr)
1979 Track lifting (Courtesy Geoff Smith, Flickr)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. Raffaele Ralph Phillips comments "Our workshop for garage maintenance on the left, which at one time housed a trailer washing facility, a painting facility along with a tyre department for storing tyres and a tyre cutting machine/ compressor for servicing and repairs on tyres. One section of the garage was for fork lift maintenance and repairs, done by Phil Plumpton who was attached to the E V M department. When l started my apprenticeship in 1970 the garage was part of T H Lewis motor engineers and they rented the site from Express Dairy, so was never a part of the actual dairy!!" (Photographer Sam Jones)
1979 South Morden rail siding and track removal. Raffaele Ralph Phillips comments "Our workshop for garage maintenance on the left, which at one time housed a trailer washing facility, a painting facility along with a tyre department for storing tyres and a tyre cutting machine/ compressor for servicing and repairs on tyres. One section of the garage was for fork lift maintenance and repairs, done by Phil Plumpton who was attached to the E V M department. When l started my apprenticeship in 1970 the garage was part of T H Lewis motor engineers and they rented the site from Express Dairy, so was never a part of the actual dairy!!" (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 South Morden rail siding and track removal. (Photographer Sam Jones)
1979 Track lifting (Courtesy Geoff Smith, Flickr)
1979 Track lifting (Courtesy Geoff Smith, Flickr)
1979 Track lifting (Courtesy Geoff Smith, Flickr)
1979 Track lifting (Courtesy Geoff Smith, Flickr)
1979 Removal of tracks from rail siding (Picture from Sam Jones via Geoff Smith)
1979 Removal of tracks from rail siding (Picture from Sam Jones via Geoff Smith)
1979 Demolition of buffers started (Courtesy Geoff Smith, Flickr)
1979 Demolition of buffers started (Courtesy Geoff Smith, Flickr)
1979 Removal of tracks from rail siding (Picture from Sam Jones via Geoff Smith)
1979 Removal of tracks from rail siding (Picture from Sam Jones via Geoff Smith)
1979 South Morden, final internal demolition inside rail siding for re-use for ice tank, engineers' workshop and boiler house. (Photographer Sam Jones)
1979 South Morden, final internal demolition inside rail siding for re-use for ice tank, engineers' workshop and boiler house. (Photographer Sam Jones)
1979 South Morden, final internal demolition inside rail siding for re-use for ice tank, engineers' workshop and boiler house. (Photographer Sam Jones)
1979 South Morden, final internal demolition inside rail siding for re-use for ice tank, engineers' workshop and boiler house. (Photographer Sam Jones)
1979 South Morden, final internal demolition inside rail siding for re-use for ice tank, engineers' workshop and boiler house. (Photographer Sam Jones)
1979 South Morden, final internal demolition inside rail siding for re-use for ice tank, engineers' workshop and boiler house. (Photographer Sam Jones)
1979 South Morden - old rail siding prior to construction of new boiler house
1979 South Morden - old rail siding prior to construction of new boiler house
1979 old rail siding after track removal. Used temporarily as a car park before conversion to lorry park
1979 old rail siding after track removal. Used temporarily as a car park before conversion to lorry park
1979 Preparation of old rail siding for car and lorry parking. (Picture from Sam Jones via Geoff Smith)
1979 Preparation of old rail siding for car and lorry parking. (Picture from Sam Jones via Geoff Smith)
1980 Views of South Morden Dairy from Morden South Station, after rail siding removal. (Photographer Sam Jones)
1980 Views of South Morden Dairy from Morden South Station, after rail siding removal. (Photographer Sam Jones)
1980 Views of South Morden Dairy from Morden South Station, after rail siding removal. (Photographer Sam Jones)
1980 Views of South Morden Dairy from Morden South Station, after rail siding removal. (Photographer Sam Jones)
1980 Views of South Morden Dairy from Morden South Station, after rail siding removal. (Photographer Sam Jones)
1980 Views of South Morden Dairy from Morden South Station, after rail siding removal. (Photographer Sam Jones)
2012 South Morden rail operations described by Sydney A. Leleux in the Industrial Railway Record, Edition 210 (September)
2012 South Morden rail operations described by Sydney A. Leleux in the Industrial Railway Record, Edition 210 (September)
2012 South Morden rail operations described by Sydney A. Leleux in the Industrial Railway Record, Edition 210 (September)
2012 South Morden rail operations described by Sydney A. Leleux in the Industrial Railway Record, Edition 210 (September)
2012 South Morden rail operations described by Sydney A. Leleux in the Industrial Railway Record, Edition 210 (September)
2012 South Morden rail operations described by Sydney A. Leleux in the Industrial Railway Record, Edition 210 (September)
2012 South Morden rail operations described by Sydney A. Leleux in the Industrial Railway Record, Edition 210 (September)
2012 South Morden rail operations described by Sydney A. Leleux in the Industrial Railway Record, Edition 210 (September)
↑Back to Top